Story
As a user I would be able to calculate the time of operation and order in case if during one operation is produced several products at one time (in one machine cycle).
Back Card
It is ne
As a user I would be able to calculate the time of operation and order in case if during one operation is produced several products at one time (in one machine cycle).
It is ne